In Moscow, the construction of a bridge for pedestrians between the Mneovnikovsky and Krylatsky plains begins. The construction will connect the Ostrovnaya Road to the paragraph No. 1074 and Nizhny Mneevniki, Sergey Sobyanin said in Max Messenger.
After implementing the project, the town residents will receive a relationship for new pedestrians between the two districts-Good-Meshiki and Krylatskoye, as well as a comfortable route to the kat canal and other sports facilities.
The new bridge will be decorated with arches like wings, and its flight will be decorated with red details. Experts will also put architectural and artistic backlights on it, the mayor said.
He appoints that the work is being conducted on both banks of the Moscow River. Their completion is planned for 2027.
Previous motion It was released On the bridge of Korolev scholar, the shellhinsk embankment and Fili park. The construction improves the transport access to 500,000 people. Moreover, it is possible to reduce the load on the third shipping ring (TTK) and Kutuzovsky Prosptekt.